$30.00 per $1,000.00 estimated cost of construction | Up to $50,000.00 |
$23.00 per $1,000.00 estimated cost of construction | $50,001.00 - $100,000.00 |
$19.00 per $1,000.00 estimated cost of construction | $100,000.00 |
$25.00.00 per $1,000.00 estimated cost of construction | Up to $50,000.00 |
$18.00 per $1,000.00 estimated cost of construction | $50,001.00 - $100,000.00 |
$15.00 per $1,000.00 estimated cost of construction | $100,000.00 |
1. Swimming Pools (R5 and R7): less than 550 sq. ft. | $75.00 | ||
Aboveground | $125.00 | ||
In-ground | $190.00 | ||
2. Fences - Over 6 feet high | $75.00 | ||
3. Antenna, mast, satellite dish (R5 and R7) | |||
All others | $50.00 | ||
4. Radon | $100.00 | ||
5. Structural Towers | $500.00 | ||
6. Underground (UST) storage tank | |||
Installation (R5 and R 7) or demolition | $75.00 | ||
7. Aboveground (AST) storage tank | |||
Installation (R5 and R 7) or demolition | $75.00 | ||
8. Asbestos Removal | $150.00 | ||
9. Temporary structures, tents, temporary trailers (20 days) | $75.00 | ||
NOTE: Tents in excess of 900 sq. feet or more than 30 ft. in any dimension | $120.00 | ||
10. Moving structures | $100.00 | ||
11. Demolition | $100.00 | ||
(a) Residential and farm buildings under 5,000 sq. ft. and less than 30 feet in | $75.00 | ||
height | |||
(b) All other use groups/per story ea. for 10,000 sq. ft. or less of floor space | $150.00 | ||
12. Retaining walls - Class 3 Residential- less than 550 square feet | $95.00 | ||
Class 3 Residential- greater than 550 square feet | $189.00 | ||
All other use groups - cost of construction as tabled sections A and B | -- -------.- | ---- | -- -- |
Plumbing fees shall be as follows: |
- | |
(a) Fees for each plumbing fixture, backflow preventor (nontestable type) | $15.00 |
(b) Water heater appliance | $35.00 |
(c) Fuel oil piping | $60.00 |
(d) Gas piping | $60.00 |
(e) Steam boiler | $60.00 |
(f) Hot water boiler | $60.00 |
(g) Sewer pump | $82.00 |
(h) Interceptor/separator and plumbing appurtenances | $82.00 |
(i) Grease trap/oil trap | $82.00 |
(j) Water-cooled AlC or refrigeration unit | $60.00 |
(k) Sewer connection: | |
Up to 6" | $82.00 |
7" to 11" | $150.00 |
12" to 23" | $250.00 |
24" and up | $300.00 |
(1) Water service connection | $82.00 |
(m) Active solar system | $82.00 |
(n) Other min fee and testable back flow preventor | $82.00 |
for cross connections and backflow preventors that are subject to testing, | |
requiring reinspection annually, the fee shall be $58.00 for each device when they | |
are tested | |
(0) Each stack | $15.00 |
(p) Each tie-in process | $15.00 |
(q) Lawn sprinklers | $45.00 |
(r) Roof drain (each)/ floor drain (each) | $35.00 |
(s) Plumbing appurtenaces (each) | $75.00 |
(t) Building sewer/drain system | $82.00 |
(u) Fees are to be based on $23.00 per $1,000 of estimated cost (i.e., hydronic | |
piping, geothermal wells, etc.) For the purpose of determining estimated cost, the | |
applicant shall submit to the department cost data produced by the architect or | |
engineer of record, or by a recognized estimating firm or by the contractor. |
1. For the purpose of computing these fees, devices, outlets, fixtures and switches | ||
shall include but not be limited to burglar alarms, intercom panels, smoke | ||
detectors, thermostats, motors, photocells, level probes, temperature sensors and | ||
similar items: | ||
(a) For the first 50 devices | $50.00 | |
(b) Each additional 25 devices or fraction thereof | $25.00 | |
2. For the purpose of computing these fees, the term service, service panel, | ||
subpanels, feeders, switches, switchboards, motor control centers, alarm panels, | ||
signs, disconnects: | ||
(a) Up to 100 amps | $75.00 | |
(b) 101 amps up to 200 amps | $125.00 | |
(c) 201 amps up to 1,000 amps | $225.00 | |
(d) 1,000 amps and above | $450.00 | |
3. For the purpose of computing these fees, all motors including ranges, ovens, | ||
surface units, dryers air conditioning units, water heater, central heat (oil, gas, | ||
electric) baseboard heat units, | generators, transformers or other devices | |
consuming, generating or altering electricity: | ||
(a) Motors and electrical devices | $15.00 | |
(b) Fractional hp: | ||
(1) Over 1 hp, up to 10 hp | $20.00 | |
(2) 11 hp up to 50 hp | $50.00 | |
(3) 51 hp up to 100 hp | $150.00 | |
(4) 101 hp up to 500 hp | $576.00 | |
(5) Each increment of 50 hp or part thereof, add $10.00 | ||
(c) Transformers and generators: | ||
(1) Fractional kw | $15.00 | |
(2) Over 1 kw up to 10 kw | $20.00 | |
(3) 11 kw up to 50 kw | $50.00 | |
(4) 51 kw up to 100 kw | $150.00 | |
(5) 101 kw up to 500 kw | $450.00 | |
(6) Each increment of 50 kw or part thereof, add $10.00 | ||
4. Pools, fountains and similar installations: Includes bonding, motor, 2 outlets | ||
and a switch: | ||
Aboveground | $126.00 | |
In-ground | $189.00 | |
5. Lights standards (each) | $15.00 | |
6. Trailers | $60.00 | |
7. Modular office cubicles (each unit) | $15.00 | |
8. Branch circuits | $35.00 | |
9. Reinspection or reintroduction of service | $35.00 |
10. Minimum fee | $75.00 |
11. All other work requiring review and inspections: | |
Fees are to be based on $23.00 per $1,000 of estimated cost (i.e., grounding grids, | |
underground conduits, etc.) For the purpose of determining estimated cost, the | |
applicant shall submit to the department cost data produced by the architect or | |
engineer of record, or by a recognized estimating firm or by the contractor. |
1. Automatic and manual fire alarm systems: | |
(a) R5 and R7 smoke detectors (11 Ovlbattery backup) | |
1-3 | $35.00 |
4-10 | $55.00 |
Over 10 | $75.00 |
(b) Alarm system | $100.00 |
All other use groups: | |
(1) Modify existing system: | |
1-5 devices | $40.00 |
Over 5 devices | $15.00 each |
Devices shall include smoke detectors, heat detectors, manual pull stations, | |
bells, horns strobes and other peripheral devices not itemized in this section. | |
(2) Install new system: | |
Automatic/manual alarm system up to 10,000 sq. ft. coverage | |
Minimum fee | $100.00 |
Additional per 10,000 sq. ft. | $150.00 |
Central station alarm | $75.00 |
Duct smoke detector | $75.00 |
Flame or beam smoke detector | $25.00 |
2. Automatic sprinkler systems: | $50.00 |
1-20 heads | $85.00 |
21-100 heads | $150.00 |
101-200 heads | $290.00 |
201-400 heads | $750.00 |
401-1,000 heads | $1035.00 |
1,000 heads and over | $1325.00 |
Each additional riser | $50.00 |
Foam suppression (not pre-engineered) | $150.00 |
Fire pump | $150.00 |
Hydraulic calculation review | $50.00 |
3. Standpipes | $290.00 |
Each additional reset | $100.00 |
4. Commercial kitchen hood and hazardous exhaust system | $175.00 |
5. Kitchen suppression systems (pre-engineered) | $125.00 |
6. Pre-engineered systems: | |
CO 2 suppression | $125.00 |
Halon suppression | $125.00 |
Foam suppression | $125.00 |
Dry chemical suppression | $125.00 |
Wet chemical suppression | $125.00 |
7. Gas or oil-fired vented appliance | |
(a) Commercial | $75.00 |
Additional devices | $30.00 |
(b) Residential | $50.00 |
Additional devices | $20.00 |
8. Water tank and underground fire main | $150.00 |
9. Flammable-Combustible storage tanks-Abovelbelow ground | |
(a) Residential: | $75.00 |
Installation/removal and LPG | |
(b) Commercial: | |
Installation/removal and LPG (includes manifold systems up to qty.) and LNG | |
Up to and including: | |
1,000 gallons | $100.00 |
2,000 gallons | $400.00 |
Over 2,000 gallons | $500.00 |
(c) Liquid or gaseous product dispensing system | $50.00 |
(d) Tank monitoring system (per tank) | $50.00 |
10. Smoke removal system (includes smoke detectors (up to 6) not otherwise | $250.00 |
covered) | |
11. Emergency generator system | $100.00 |
12. Elevator recall | $150.00 |
13. Automatic smoke-fire control doors or shutters (pair) (Security locking | $75.00 |
devices integrated with alarm systems) | |
14. Emergency and voice com systems | $100.00 |
15. Incinerators and crematoriums | $460.00 |
16. Minimum (residential) | $35.00 |
(commercial) | $75.00 |
Heating/conversion/replacement - R5 | |
First unit | $65.00 |
Each additional unit | $15.00 |
Class I | $790.00 | I |
Class II | $395.00 | ! |
Class III | $295.00 | I |
1. Certificate of occupancy | |
(a) R5 and R7 residential single family | $100.00 |
(b) All other use groups per occupancy | $150.00 |
2. Continued certificate of occupancy | Min. fee per subcode |
3. Change of use | $200.00 |
4. Certificate of approval | No fee |
5. Temporary Certificate of Occupancy - first issuance and renewal | $35.00 |
(No fee for first issuance, if CO fee has already been paid) |